Gate post form |
Lower hinge studs |
Gate post form complete |
Gate post fresh in form |
Gate post in form with my helper |
Pulling gate post to hole |
Preparing the gate hole for the gate post |
Raising the gate post, boards protect the far wall of the hole |
Gate post plumb and braced |
West wall footing form redy for pour |
West footing ready for pour |
Concrete workers slacking off |
Electrical conduit exits the form into the dirt |
Mixing concrete for west footing |
Stuffing the gate post hole with concrete |
Topping up the gate post hole |
West footing half poured |
West footing poured, still in form |
West footing with form removed |
East footing ready for pour, strike post at far end |
West brick wall 3/4 laid |
Outside view of cap mould. Cap will be cast in the other side |
Post cap with conduit for lamp |
Lamp base and concrete anchor |
East wall near completion, missing two caps and cleaning |
|
|
|