![Gate post form](thumbnails/thumb_109-0956_IMG.JPG) Gate post form |
![Lower hinge studs](thumbnails/thumb_120-2059_IMG.JPG) Lower hinge studs |
![Gate post form complete](thumbnails/thumb_120-2061_IMG.JPG) Gate post form complete |
![Gate post fresh in form](thumbnails/thumb_120-2063_IMG.JPG) Gate post fresh in form |
![Gate post in form with my helper](thumbnails/thumb_120-2065_IMG.JPG) Gate post in form with my helper |
![Pulling gate post to hole](thumbnails/thumb_121-2149_IMG.JPG) Pulling gate post to hole |
![Preparing the gate hole for the gate post](thumbnails/thumb_121-2151_IMG.JPG) Preparing the gate hole for the gate post |
![Raising the gate post, boards protect the far wall of the hole](thumbnails/thumb_121-2152_IMG.JPG) Raising the gate post, boards protect the far wall of the hole |
![Gate post plumb and braced](thumbnails/thumb_121-2153_IMG.JPG) Gate post plumb and braced |
![West wall footing form redy for pour](thumbnails/thumb_121-2182_IMG.JPG) West wall footing form redy for pour |
![West footing ready for pour](thumbnails/thumb_121-2183_IMG.JPG) West footing ready for pour |
![Concrete workers slacking off](thumbnails/thumb_110-1062_IMG.JPG) Concrete workers slacking off |
![Electrical conduit exits the form into the dirt](thumbnails/thumb_110-1064_IMG.JPG) Electrical conduit exits the form into the dirt |
![Mixing concrete for west footing](thumbnails/thumb_110-1068_IMG.JPG) Mixing concrete for west footing |
![Stuffing the gate post hole with concrete](thumbnails/thumb_110-1070_IMG.JPG) Stuffing the gate post hole with concrete |
![Topping up the gate post hole](thumbnails/thumb_110-1071_IMG.JPG) Topping up the gate post hole |
![West footing half poured](thumbnails/thumb_110-1073_IMG.JPG) West footing half poured |
![West footing poured, still in form](thumbnails/thumb_121-2189_IMG.JPG) West footing poured, still in form |
![West footing with form removed](thumbnails/thumb_121-2198_IMG.JPG) West footing with form removed |
![East footing ready for pour, strike post at far end](thumbnails/thumb_123-2323_IMG.JPG) East footing ready for pour, strike post at far end |
![West brick wall 3/4 laid](thumbnails/thumb_124-2462_IMG.JPG) West brick wall 3/4 laid |
![Outside view of cap mould. Cap will be cast in the other side](thumbnails/thumb_126-2608_IMG.JPG) Outside view of cap mould. Cap will be cast in the other side |
![Post cap with conduit for lamp](thumbnails/thumb_IMG_2701.JPG) Post cap with conduit for lamp |
![Lamp base and concrete anchor](thumbnails/thumb_IMG_2703.JPG) Lamp base and concrete anchor |
![East wall near completion, missing two caps and cleaning](thumbnails/thumb_IMG_2707.JPG) East wall near completion, missing two caps and cleaning |
|
|
|