 Gate post form |
 Lower hinge studs |
 Gate post form complete |
 Gate post fresh in form |
 Gate post in form with my helper |
 Pulling gate post to hole |
 Preparing the gate hole for the gate post |
 Raising the gate post, boards protect the far wall of the hole |
 Gate post plumb and braced |
 West wall footing form redy for pour |
 West footing ready for pour |
 Concrete workers slacking off |
 Electrical conduit exits the form into the dirt |
 Mixing concrete for west footing |
 Stuffing the gate post hole with concrete |
 Topping up the gate post hole |
 West footing half poured |
 West footing poured, still in form |
 West footing with form removed |
 East footing ready for pour, strike post at far end |
 West brick wall 3/4 laid |
 Outside view of cap mould. Cap will be cast in the other side |
 Post cap with conduit for lamp |
 Lamp base and concrete anchor |
 East wall near completion, missing two caps and cleaning |
|
|
|